CCMS Evaluation · A Practical Guide

How To Write A CCMS Requirements Brief Before Speaking To Vendors

Start With Real Tasks. Define Success. Compare The Evidence.

Real Tasks

Start with the work your team needs to accomplish.

Clear Requirements

Connect each priority to an observable result.

Evidence

Ask vendors to demonstrate representative scenarios.

Shared Decisions

Name the owner and keep unresolved questions visible.

A useful CCMS requirements brief explains what your documentation team needs to accomplish, what is difficult today and how you will judge a better way of working. Start with a small set of important tasks, then connect each requirement to an observable result.

That gives vendors something more useful than a long list of features. It also gives your team a common reference when demonstrations, pricing and competing opinions begin to arrive.

A component content management system (CCMS) manages reusable content components, such as topics, rather than treating every publication as an independent file.

Start With A Task That Matters

Choose a real task from your documentation workflow. For example, a writer may need to update a procedure used in several product manuals while preserving the instructions for an older release. A reviewer may need to approve a technical change without learning a new authoring tool. A localization manager may need to identify which material changed since the previous handoff.

Describe the situation before naming the solution. Who performs the task? What starts it? What content is involved? Where does it become slow, confusing or difficult to verify?

The principle is consistent with the UK Government’s guidance on understanding users and their needs: investigate the problem and test assumptions before committing to a solution. Applied to a CCMS evaluation, this means observing actual documentation work rather than guessing what a feature might improve.

Turn The Problem Into A Testable Requirement

“Better reuse” is difficult to evaluate. A more specific requirement might be: “An author must be able to identify the approved shared procedure, update it and determine which publications need review.” The evaluation can then ask the vendor to demonstrate that sequence with representative content.

Record the expected result separately from the desired implementation. Your team might prefer a particular screen or button, but another workflow could meet the same need. Conversely, an attractive screen is not enough if the result cannot be demonstrated.

For each requirement, capture five details:

  • The person or team who needs it.
  • The task and business reason.
  • A representative content example.
  • The result that would count as success.
  • The person responsible for judging that result.

For the shared procedure example, success might include a clear list of affected publications and a reviewable change history. These are proposed evaluation criteria, not a claim that every CCMS provides them in the same way.

Worked Example: Update A Shared Procedure

Scenario: A procedure appears in two current manuals and one older release.

Task: Revise the procedure for the current manuals without changing the approved older release.

Evidence to request: Show where the procedure is used, which version each publication references, the review decision and the final outputs.

Acceptance owner: The documentation lead, with a release owner checking the older publication.

This is an illustrative test to adapt to your workflow, not a statement about any vendor’s standard configuration.

For a concise way to describe the user, goal and acceptance criteria, see the UK Government’s guidance on writing user stories.

Separate Essentials From Preferences

A requirement is essential when its absence would prevent the intended operation or create an unacceptable risk. A preference makes work more convenient but may allow an acceptable alternative.

Ask the requirement owner what would happen if it were not met. If the answer is unclear, the team may need more investigation before assigning it the highest priority. A label such as “must have” should explain a decision, not end the discussion.

Keep future needs visible, but distinguish confirmed plans from possibilities. A new language required next year is different from a channel someone might explore eventually. Vendors need to understand both, but your evaluation should not treat them as equally certain.

Include The Operating Environment

Your brief should identify current authoring tools, content formats, publishing outputs, languages and systems that affect the workflow. Include the roles of IT, reviewers and localization partners where relevant. Identify the internal policies that any implementation must satisfy, without assuming that a vendor’s standard configuration meets them.

State important constraints plainly. These might include a product release date, limited staff availability, an existing editorial process or a required output format. Constraints help reveal whether an otherwise attractive option is practical.

Keep The Brief Usable

Begin with a short summary and a manageable number of priority scenarios. Put detailed inventories in an appendix. A brief that no one can review is unlikely to produce consistent decisions.

Before sending it out, ask someone outside the writing team to read it. Can they explain the problem and recognize a successful result? If not, tighten the language. Then give every shortlisted vendor the same version and record later changes so that your comparison remains fair.

For a broader view of the capabilities to consider, read Bluestream’s CCMS replacement checklist. Use the brief to decide which of those areas matter most to your organization.

A Short CCMS Requirements Brief Template

Use these seven prompts to prepare a brief your colleagues and shortlisted vendors can review:

  • Problem and evidence: What is difficult today, and what examples demonstrate it?
  • People and workflow: Who performs the work, and which steps are involved?
  • Representative content: Which topics, publications and versions will you use in the evaluation?
  • Essential result and acceptance test: What must happen, and how will you verify it?
  • Priority and reason: Is this essential or a preference, and why?
  • Systems, outputs and constraints: What must the solution work with, produce or accommodate?
  • Decision owner and open questions: Who accepts the result, and what still needs investigation?
A Filled-In Brief • Illustrative Example

Seven Fields. One Testable Scenario.

01

Problem & Evidence

One shared procedure, three manuals

Two current manuals need the revised instructions. The approved older release must stay unchanged.

02

People & Workflow

Writer → Review → Release

Name who revises the procedure, who reviews the change and who checks the published outputs.

03

Representative Content

Bring A Small Test Pack

Use the shared procedure, both current manuals and the approved older-release publication.

04

Acceptance Test

Prove Both Outcomes

Current outputs contain the approved revision. The older-release output retains its approved instructions.

05

Priority & Reason

Essential For This Scenario

Preserving the older release is required here. Record the consequence if this requirement is not met.

06

Systems & Constraints

Record The Real Environment

Add your actual formats, authoring tools, output types and release constraints before the demonstration.

07

Owner & Open Questions

Assign The Decision

Documentation lead accepts the result; release owner checks the older publication. Ask how exceptions are handled.

Use This As A Worksheet: Replace the example with your own task and evidence. These are proposed evaluation criteria, not a promise about any vendor’s standard configuration.

Questions About CCMS Requirements

How Detailed Should A CCMS Requirements Brief Be?

Detailed enough to explain the important tasks, constraints and success criteria. Start with priority scenarios and link to supporting inventories rather than placing every detail in the main brief.

Should We Write Requirements Before A Demonstration?

A preliminary brief helps focus the demonstration. You can revise it as you learn, but record the reasons for changes and use the revised criteria consistently.

Who Should Approve The Brief?

The people accountable for the affected work should review it. Depending on the project, that can include documentation, IT, localization, product teams and the budget owner.

Continue Your CCMS Evaluation

Ready to explore the next step? Join What To Look For When Choosing A CCMS on December 2 for a discussion with Dawn Stevens and Rahel Bailie.

Discuss Your CCMS Requirements

Have a question about your documentation workflow? Contact Bluestream using the form below.

Sign-up for the latest Bluestream News

Close